Jira Status

Jira SSH tunnel already open.
189
Active Tickets
Across active Jira users
4
Over Budget
Tickets already over estimate
69
Warnings
Forecast or close to budget
13
Unestimated
Tickets with time but no estimate
86
In Progress
Currently being worked on
103
Scheduled
Planned or queued work
12
Developers Active
With assigned active tickets
74
Internal / Infra
Internal and infrastructure work

Over Budget Tickets

Tickets where time spent is greater than the original estimate.

4 tickets
Ticket IDDeveloperSummaryStatusOriginalSpentOver ByReporter
PR-12511Nicholas AshleyTesting Facility: Software Build (Selenium box)In Progress23:0077:0054:00Carl Hinton
PR26280-1Nicholas AshleyHub: Return to the master branchIn Progress1:005:004:00Carl Hinton
PR-11894Nick PoulsonBoomerang bulk mailingsScheduled1:001:300:30Carl Hinton
PR25266-3Zara RobertsUK Timber Server Moves: Creation of Workbook & CSVIn Progress0:300:400:10Carl Hinton

🧑‍💻 Active Jira Users and Assigned Tickets

Carl Hinton (carl.hinton)

Email: carl.hinton@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR-12652 Find a way of turning off Prestashop updates In Progress 01:00 01:30 00:30 Carl Hinton Warning
NPD-73 Test Smartcon Update of PHP In Progress 00:43 01:47 Carl Hinton Unestimated
NPD-72 Consolidated PHP Upgrade code In Progress 01:21 00:51 Carl Hinton Unestimated
NPD-61 AI PHP 7.2 to 7.3 updater In Progress 02:00 02:20 Carl Hinton Unestimated
INF-1836 Turn Developer monitoring back on in our Monitoring system In Progress 00:00 03:20 Carl Hinton Infrastructure
INF-1835 Sentry staging removal In Progress 02:00 02:10 01:50 Carl Hinton Infrastructure
INF-1821 Speed up the copy from S3 to S3 script In Progress 10:00 18:23 01:37 Carl Hinton Infrastructure
INT-419 R&D 2026 In Progress 00:00 02:58 Carl Hinton Internal
PR-12524 Auto-production sync to staging In Progress 21:00 18:00 Carl Hinton Okay
PR-12508 Selenium - first steps In Progress 08:00 00:00 Carl Hinton Unestimated
PR25279-4 Documentation of the callhome licencing system In Progress 00:33 00:27 Carl Hinton Unestimated
INT-407 Creation of Specifications for new work/projects Scheduled 03:21 05:35 Zara Roberts Internal
INT-405 Cost Saving Admin In Progress 00:00 09:36 Philippa Poulson Internal
NPD-12 Take over of webalizer In Progress 11:00 20:40 01:20 Carl Hinton Okay
INT-395 Meeting with Nick Ashley and Associated Outcomes In Progress 00:00 12:55 Carl Hinton Internal
INT-379 Discussion around WP "Fast Track" Scheduled 03:00 04:30 01:30 Carl Hinton Internal
PR-11723 UK Sleepers: Customer Account - Creating Templates In Progress 12:00 14:15 09:45 Greg Poulson Warning
PR-11704 UK Sleepers: Customer Account Login and Functionality In Progress 16:00 16:00 04:00 Greg Poulson Warning
INF-1316 Consolidate the WP Boxes Scheduled 00:00 Carl Hinton Infrastructure
PR25264-17 Dove Location Pages update Content Scheduled 08:00 16:00 Carl Hinton Okay
INT-312 Staging56 Server Moves In Progress 00:00 13:35 Carl Hinton Internal
PR-11187 Walter Bloms: WebAdmin Fixes In Progress 20:40 21:25 19:25 Mike Walters Warning
INT-305 Nick & Carl - Backup Work Scheduled 00:00 03:15 Carl Hinton Internal
PR21228-133 PHP Unit tests on the new functionality In Progress 04:00 06:00 02:15 Carl Hinton Warning
INT-281 Create Step by Step plan for server costs Scheduled 00:00 Carl Hinton Internal
INT-270 Create document outlinging DevOps/SysOps Strategy Scheduled 00:00 04:26 Carl Hinton Internal
INT-263 Developers Team Meeting Scheduled 00:00 00:20 Carl Hinton Internal
INT-253 Full back up of Everything In Progress 00:00 Carl Hinton Internal
INT-51 Staff management and support In Progress 00:03 19:53 Carl Hinton Internal
INT-9 System Admin Scheduled 00:00 12:26 Philippa Poulson Internal

Fred Robinson (fred.robinson)

Email: fred@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR-12450 WM Website: Convert from Lovable to WordPress - Internal Meetings & Admin In Progress 00:00 09:30 Greg Poulson Unestimated
PR-12373 Freetimers.com: Testing Pagebuilder In Progress 02:00 02:00 02:00 Greg Poulson Warning
PR25277-36 Delkim: Additional Chargable Items In Progress 01:00 09:25 Greg Poulson Unestimated
PR-12368 Freetimers.com: Transfer content from current site to new In Progress 12:00 12:00 12:20 Greg Poulson Over
PR-12353 Freetimers.com: Add Templates from Current Live site to New Staging Site In Progress 16:00 16:00 08:24 Greg Poulson Over
PR25277-22 Delkim: Build - Functionality to make blocks editabled easily In Progress 08:00 15:00 01:00 Greg Poulson Okay
PR25273-62 Bloms Bulbs: Change wording on Cart Scheduled 00:30 01:00 Greg Poulson Warning
PR25273-60 Bloms Bulbs: Add new low stock label for products Scheduled 02:30 03:00 02:00 Greg Poulson Warning
PR25273-58 Bloms Bulbs: Customers also looked at after product information Scheduled 00:15 00:15 00:15 Greg Poulson Warning
PR25273-57 Bloms Bulbs: Product images not cropped according to orientation Scheduled 01:00 01:00 01:15 Greg Poulson Warning
PR25273-56 Bloms Bulbs: Remove iStock label Scheduled 00:30 01:00 Greg Poulson Warning
PR25273-52 Bloms Bulbs: Add new section/pattern with CTAs Scheduled 02:00 02:15 01:45 Greg Poulson Warning
PR25264-79 Samson Awnings Location Pages: API sending data Scheduled 00:30 01:00 Carl Hinton Warning

Help4IT (help4it)

Email: noreplay@example.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
CINF-165 create a redis cache for The Hub In Progress 00:00 02:57 Philippa Poulson Infrastructure
INF-1167 Help4IT: Add a Zabbix monitor onto the Hub box for a Redis cache In Progress 00:00 04:48 Carl Hinton Infrastructure
INF-998 removing MSP360 and replacement with bacula for VA1, UKF4, WP01 and WP02 Scheduled 04:00 08:00 Philippa Poulson Infrastructure
INF-973 Help4IT: WP01 Logrotate Scheduled 00:00 Philippa Poulson Infrastructure
INF-905 Help4IT: Install Bakula backup and Zabbix Monitoring to WP06 Scheduled 00:00 03:57 Carl Hinton Infrastructure

Nicholas Ashley (nicholas.ashley)

Email: nicholas.a@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
CINF-311 Build UKT2 Replacement Server In Progress 00:00 00:00 12:30 Carl Hinton Infrastructure
PR-12644 GDO - anti DDOS upgrade - WT0104 In Progress 07:00 07:00 07:00 Philippa Poulson Warning
INF-1814 ENTX Server: Downtime issues In Progress 00:00 11:30 Nicholas Ashley Infrastructure
PR26281-12 Hub Node Push: Internal Meetings & Admin In Progress 05:00 09:28 02:28 Carl Hinton Warning
INF-1813 Investigate Boomerang Charges Scheduled 01:00 01:55 00:05 Carl Hinton Infrastructure
PR-12512 Hub: Create Selenium tests for hub In Progress 10:00 18:10 01:50 Carl Hinton Okay
PR-12511 Testing Facility: Software Build (Selenium box) In Progress 23:00 23:00 05:00 Carl Hinton Over
PR26280-1 Hub: Return to the master branch In Progress 01:00 01:00 05:00 Carl Hinton Over
PR25276-42 UKT HUB Products - Post Live Issues In Progress 00:00 20:30 Greg Poulson Unestimated
PR25276-40 UKT HUB Products: Go Live Planning In Progress 20:00 04:00 17:30 Greg Poulson Warning
INF-1774 Server Audit Scheduled 08:00 16:00 Greg Poulson Infrastructure
PR-12418 UKT: HUB Connector Node Push Scheduled 05:00 06:10 12:50 Greg Poulson Over
PR-12356 2026 data cleanse in boomerang for CC1000 In Progress 04:00 04:00 08:15 Philippa Poulson Over
INF-1697 FT Accounts System | Issue with delivery Scheduled 01:00 01:30 00:30 Philippa Poulson Infrastructure
NPD-8 Creation of Image for AWS In Progress 22:26 22:26 22:26 Carl Hinton Warning
PR25276-35 UKT: Category Structures In Progress 12:00 07:00 08:51 Greg Poulson Over
INF-1677 Consolidate ENTX to ENTX Shared Server New In Progress 00:00 00:00 05:00 Carl Hinton Infrastructure
INF-1675 WOO Commerce Research Scheduled 01:00 02:00 Carl Hinton Infrastructure
INF-1648 Install composer 2 on staging environments Scheduled 00:30 00:50 00:10 Carl Hinton Infrastructure
INF-1645 Transfer all configurations from Satis to packistry In Progress 05:00 05:00 05:42 Carl Hinton Infrastructure
INF-1634 Composer 2 Repository Solution In Progress 03:00 05:00 01:00 Nicholas Ashley Infrastructure
CINF-291 UK Sleepers PHP 5.6 Staging: Mend broken site Scheduled 00:30 01:00 Carl Hinton Infrastructure
INF-1614 UKF4r: Memory Issues - Recommendations Scheduled 00:30 01:00 Carl Hinton Infrastructure
INF-1613 Review Freetimers Infrastructure with Matt Scheduled 02:00 04:00 Carl Hinton Infrastructure
INF-1612 WP08: Memory Issues - Recommendations Scheduled 00:30 01:00 Carl Hinton Infrastructure
INF-1611 Delkim 1 Server: Memory Issues - Recommendations Scheduled 00:30 01:00 Carl Hinton Infrastructure
INF-1608 Quotation for WP02: Memory Issues Scheduled 00:30 01:00 Carl Hinton Infrastructure
INF-1596 admin2 PDF and Invoice not matching In Progress 00:00 01:30 Carl Hinton Infrastructure
PR21232-509 UK Timber HUB: Review by Nick A and Greg Scheduled 00:00 Greg Poulson Unestimated
PR25276-26 UKT: Completed Report to Load on Screen and have CSV Download Option Scheduled 01:30 03:00 Greg Poulson Warning
PR25276-27 UKT: Report at Top to Repeat the Date & Category Perameters Scheduled 05:30 11:00 Greg Poulson Okay
PR25276-23 UKT: Report to Start with From/To Scheduled 01:00 02:00 Greg Poulson Warning
PR25276-24 UKT: Provide a Categroy Selection Mechanism to the Report Scheduled 02:00 04:00 Greg Poulson Warning
PR25276-25 UKT: Add a Create a Report Button Scheduled 00:00 Greg Poulson Unestimated
PR25276-22 UKT: Add to Reports Module a "Sales by Category" Report Scheduled 06:00 12:00 Greg Poulson Okay
PR25276-18 UKT: When pressing Add Product it goes to Product Variant Screen Scheduled 06:00 12:00 Greg Poulson Okay
PR25276-19 UKT: Category Assignments to be saved for Analysis Reporting Scheduled 00:00 Greg Poulson Unestimated
PR25276-20 UKT: RAW & CCP to have Category Assignemnt Saved for the order Scheduled 05:30 11:00 Greg Poulson Okay
PR25276-21 UKT: Ensure Product Categories captured for Web Sales and Admin Orders In Progress 10:30 10:30 08:32 Greg Poulson Over
PR25276-17 UKT: Change Pop Up Search to a Product Filtering Mechanism Scheduled 08:30 17:00 Greg Poulson Okay
PR-11713 re-set up sudo log Scheduled 01:00 02:00 Philippa Poulson Warning
CINF-211 Add auto-restart to monitoring system Scheduled 02:00 03:00 01:00 Carl Hinton Infrastructure
PR-11354 UKF4R box ip 52.56.100.58 Scheduled 00:15 00:30 Carl Hinton Warning
PR-11045 boomerang: broken sitemap - SR3334 Scheduled 01:00 01:55 00:05 Philippa Poulson Warning
PR-11034 create switching mechanism for GDC emails to be sent through different provider Scheduled 02:00 04:00 Philippa Poulson Warning
PR-11033 create switching mechanism for GDO emails to be sent through different provider Scheduled 02:00 04:00 Philippa Poulson Warning
PR-10859 BoomerangTest site update In Progress 04:00 08:00 04:00 Philippa Poulson Warning
PR-10792 FT admin area - issue with "prompt days" in Sales Orders Scheduled 01:00 02:00 Philippa Poulson Warning
INF-1112 Migration bitbucket to github - group 1 - Endpoints Scheduled 04:00 04:00 04:26 Carl Hinton Infrastructure
INF-1016 Carl's connection to VA1 lost Scheduled 07:00 10:10 02:50 Carl Hinton Infrastructure
PR-10577 2 servers according to attached list In Progress 02:00 04:00 Philippa Poulson Warning
PR-10025 log for Boomerang Scheduled 02:00 04:00 Philippa Poulson Warning
INF-551 review "call-home" document In Progress 01:00 01:00 08:00 Philippa Poulson Infrastructure
PR-6761 Review rules regarding Boomerang server infrastructure Scheduled 02:00 07:00 00:00 Philippa Poulson Warning

Nick Poulson (nick.poulson)

Email: nick.poulson@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
INF-1833 Move Hillcrest from WP03 to WP09 Scheduled 02:00 04:00 Carl Hinton Infrastructure
INT-415 AWS Clients tagging In Progress 14:00 21:30 06:30 Carl Hinton Internal
INF-1716 AWS | Snapshot identification In Progress 04:00 04:00 23:50 Carl Hinton Infrastructure
INF-1622 Creation of Alma8 Box Scheduled 00:00 Philippa Poulson Infrastructure
PR-11894 Boomerang bulk mailings Scheduled 01:00 01:00 01:30 Carl Hinton Warning
CINF-259 Decommission: Teesurology on WP03 In Progress 00:30 00:30 00:50 Carl Hinton Infrastructure
INF-1395 Upgrade WP03 to allow multiple PHPs Scheduled 07:00 07:00 13:45 Carl Hinton Infrastructure
INT-373 Add Delkim credentials to LastPass Scheduled 00:30 00:45 00:15 Carl Hinton Internal
INF-1315 Tag Assets on AWS (Server id) Scheduled 07:00 08:44 08:16 Carl Hinton Infrastructure
CINF-201 UK Timber & ENTX: Monthly report on IPs stopped by AntiDDOS Scheduled 04:00 06:00 05:42 Carl Hinton Infrastructure
INF-1271 Daily Ticket: Test Internal Internet Speeds Scheduled 10:00 15:45 04:15 Carl Hinton Infrastructure
INF-1264 Auto-Delection (ongoing ticket) Scheduled 09:00 04:45 13:20 Carl Hinton Infrastructure
INT-313 Linux for PHP Developers Training Scheduled 00:00 Carl Hinton Internal
ID-233 Nick: Equality Project Scheduled 10:00 14:25 05:35 Nick Poulson Warning
PR-11160 SSL boomerangrentals.co.uk In Progress 01:30 02:00 01:30 Nick Poulson Warning
INT-309 Nick DNS Shadowing/Training with Matt Scheduled 00:00 01:00 Carl Hinton Internal
PR-11103 assisting Philippa/Greg Scheduled 15:00 15:00 19:30 Philippa Poulson Over
INT-304 Nicholas Poulson: Level 4 Network Engineer Apprenticeship In Progress 00:00 06:35 Nick Poulson Internal
INF-1187 Generation work on Missing sites In Progress 07:00 11:00 22:30 Carl Hinton Infrastructure
INT-292 Server Reconciliation In Progress 16:30 07:30 Philippa Poulson Internal
CI-315 Weekly PRW Content Updates Scheduled 04:00 04:00 10:42 Philippa Poulson Over
INF-1570 ESTIMATE: Transfer LastPass entries to DashLane Scheduled 00:00 Carl Hinton Infrastructure
ID-228 Additional training (outside apprenticeship) Scheduled 03:30 03:30 01:15 Philippa Poulson Over
INT-287 find all bookings for EE for their support question Scheduled 00:00 01:00 Philippa Poulson Internal
PR-10849 resurrecting lost PRW sites - server 2 In Progress 15:00 15:00 17:00 Philippa Poulson Over
PR-10848 resurrecting lost PRW sites - server 1 In Progress 15:00 15:00 05:45 Philippa Poulson Over
INT-284 Nicholas Poulson: Induction Scheduled 00:00 23:23 Carl Hinton Internal
INF-995 WEEKLY Data on all Backups Scheduled 00:00 Zara Roberts Infrastructure
INF-1524 Zabbix - add monitoring To prevent problem like disk full or similar In Progress 00:00 17:00 Philippa Poulson Infrastructure

Patryk Kaczmarek (patryk.kaczmarek)

Email: patryk.kaczmarek@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR26283-8 Unimac: Manual Content Scheduled 03:30 07:00 Greg Poulson Warning
PR26283-7 Unimac: Customer and Order Import Scheduled 03:30 07:00 Greg Poulson Warning
PR26283-5 Unimac: Frontend Transfer In Progress 21:00 07:30 10:30 Greg Poulson Okay
ENTX-329 ENTX: Blocks and Badges Improvements Scheduled 12:00 00:00 Greg Poulson Okay
ENTX-328 ENTX: Orders Module Improvements Scheduled 10:00 20:00 Greg Poulson Okay
ENTX-325 Phase 2 Issues found on Freetimers.com New Site In Progress 00:00 00:00 15:35 Greg Poulson Over
ENTX-304 Phase 2: "Nice to Have" work In Progress 14:00 14:00 23:15 Greg Poulson Over
PR25278-26 UKT: Update the database In Progress 00:00 01:32 Greg Poulson Unestimated
ENTX-302 Phase 3 Entegra Prep In Progress 03:00 03:00 11:51 Greg Poulson Over
PR-12374 Freetimers.com: Cart/Checkout Scheduled 05:00 09:48 00:12 Greg Poulson Okay
INF-1646 Amend Entegra X configuration files to use Packagist and Composer 2 Scheduled 03:00 06:00 Carl Hinton Infrastructure
PR25273-43 Bloms Bulbs: Roll out & Go Live In Progress 02:00 02:00 15:33 Greg Poulson Over
ENTX-286 Migrate remaining modules to match what was done with News In Progress 03:20 03:20 09:20 Philippa Poulson Over
PR23110-80 Links to "Custom Cut Application" Scheduled 03:00 06:00 Mike Walters Warning
PR23110-66 UK Sleepers: Remove MongoDb Scheduled 12:00 00:00 Carl Hinton Okay
PR21232-478 UK Timber Hub: Planning Scheduled 00:30 01:00 Carl Hinton Warning
INT-285 Patryk Kaczmarek: Induction Scheduled 00:00 12:04 Carl Hinton Internal
PR21232-435 Resurrect Find Event and Trigger code Scheduled 06:00 12:00 Carl Hinton Okay
PR21232-434 UK Timber Hub: Define an Order Status that Validates Loyalty Points (per channel) Scheduled 01:00 02:00 Carl Hinton Warning
PR21232-432 UK Timber Hub: Changes to Loyalty Points on Website show in Hub Scheduled 04:00 08:00 Carl Hinton Warning
PR21232-431 UK Timber Hub: Changes to Loyalty Points in Hub show on Website Scheduled 04:00 08:00 Carl Hinton Warning

Philippa Poulson (philippa.poulson)

Email: philippa.poulson@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR-12656 Boomerang PHP Upgrade specification Scheduled 21:00 03:00 15:00 Philippa Poulson Okay
PR-11921 Trinity Property Group Licences Scheduled 01:00 01:44 00:16 Philippa Poulson Warning
INF-1318 Jira considerations Scheduled 02:00 04:00 Carl Hinton Infrastructure
CI-336 Durasteel: Admin Login for Chris A Scheduled 00:15 00:15 00:15 Christina Angelopoulou Warning
PR-11295 Commercial Awnings UK: Email Delivery Issues Scheduled 00:35 00:35 00:55 Mike Walters Warning
PR-10858 concern over boomerang servers In Progress 02:00 02:00 01:00 Philippa Poulson Warning
INF-893 DeskLog: Create an account for Nithin In Progress 00:30 00:30 00:30 Philippa Poulson Infrastructure

Sam Gyseman (sam.gyseman)

Email: sam.gyseman@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
SR-1357 Add to Shipping options for admin In Progress 00:00 Samson Doors Unestimated
SR-1238 Product attributes to be excluded In Progress 00:00 Samson Doors Unestimated

Stephanie Picton (steph.picton)

Email: Stephanie.Picton@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR-6656 Quote system and Track Enquiries & Quotes area in webadmin In Progress 12:00 03:00 21:00 Philippa Poulson Okay
PR-6082 H H Tuition new web site In Progress 23:00 22:00 Paul Fegan Okay
PR-3095 new USA site In Progress 04:00 08:00 Philippa Poulson Warning

Tsepo Nyakonda (tsepo.nyakonda)

Email: tsepo.nyakonda@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR-11398 Aaron Fencing: change phone icon to email icon Scheduled 00:00 00:00 02:45 Philippa Poulson Over
PR-10613 Elimproperties.net: Update PHP (currently on PHP 5.6) Scheduled 01:30 03:00 Philippa Poulson Warning

Yasin Sezer (yasin.sezer)

Email: yasin.sezer@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR26282-6 Garden Gates Direct - Theme/Frontend Configuration Scheduled 04:00 08:00 Greg Poulson Okay
PR26282-5 Garden Gates Direct - Data Migration In Progress 18:00 17:45 15:15 Greg Poulson Okay
INF-1788 Centralised System for Customer Subscriptions In Progress 00:00 Philippa Poulson Infrastructure
PR-12452 Delkim: Set up Sentry on both Delkim Servers In Progress 05:00 05:00 04:30 Greg Poulson Warning
INF-1781 Main branches In Progress 21:00 21:00 13:45 Carl Hinton Infrastructure
INT-401 Documentation on SendMail Scheduled 00:00 Zara Roberts Internal
INT-255 over-budget time Scheduled 00:00 Philippa Poulson Internal

Zara Roberts (zara.roberts)

Email: Zara.Roberts@freetimers.com

Issue IDSummaryStatusO EstimateR EstimateSpentReporterAlert
PR25279-11 Cookie Module: Set up on Jira / Project sheets In Progress 00:30 00:41 00:19 Zara Roberts Warning
PR25277-31 Delkim: Testing In Progress 05:00 05:00 07:20 Greg Poulson Warning
INF-1590 Developer Machines Scheduled 00:00 Carl Hinton Infrastructure
PR25270-1 Set up on Jira / Project sheets In Progress 01:00 01:40 00:20 Zara Roberts Warning
PR25266-3 UK Timber Server Moves: Creation of Workbook & CSV In Progress 00:30 00:30 00:40 Carl Hinton Warning
PR-11351 Samson Awnings: Rebuild of Dedicated box for PHP 8.2 Scheduled 00:15 00:30 Philippa Poulson Warning
INT-316 Creation of spreadsheet for iStock Library In Progress 00:00 03:33 Philippa Poulson Internal
PR22257-53 Reallocated PMO time (from Internal tickets) In Progress 00:00 04:20 Philippa Poulson Unestimated
PR23110-88 UK Sleepers: Beams and Boards Scheduled 00:00 Carl Hinton Unestimated
PR21228-125 Awnings Online: Orders Confirmed to Customer (External and Internal) Scheduled 00:00 Greg Poulson Unestimated
PR21232-473 Create the dashboard page Scheduled 00:00 06:30 Patryk Kaczmarek Unestimated
PR23110-44 UK Sleepers: Downloads Scheduled 00:15 00:15 02:05 Greg Poulson Over
PR23115-1 GDO: Creation of Workflow In Progress 01:00 01:20 00:40 Christina Angelopoulou Warning
PR-10552 Teesurology: Additonal Support following Site Down In Progress 00:00 11:55 Philippa Poulson Unestimated
PR22263-31 Samson Security Shutters: Pre UAT Testing In Progress 05:00 09:24 00:36 Carl Hinton Warning
PR-10020 Entegra SEO Location Module - spec and quote Scheduled 02:00 03:00 01:00 Carl Hinton Warning